YOU EITHER GET IT OR YOU DONT

Members Login
Username 
 
Password 
    Remember Me  
Post Info TOPIC: Engineering Math Question
Fiz


Senior Member

Status: Offline
Posts: 206
Date: Jan 8, 2009
Engineering Math Question


A track hoe weighing 22 tons is on top of a lowboy trailer and heading east on Interstate 70 near Hays, Kansas.
 

The extended shovel arm is made of hardened refined

steel and the approaching overpass is made of

commercial-grade concrete, re inforced with 1½ inch

steel rebar spaced at 6 inch intervals in a criss-cross

pattern layered at 1 foot vertical spacing.
 

Solve: When the shovel arm hits the overpass, how fast

do you have to be going to slice the bridge in half ?

(Assume no effect for headwind and no braking by the driver...)
 

Extra Credit: Solve for the time and distance

required for the entire rig to come to a complete stop

after hitting the overpass at the speed calculated above.  Yes you can neglect to include friction in your calculations...







.....  Whatever! 

Apparently the driver was talking on his mobile!!



__________________

www.actonhotrod.com
blk-event.png



WIND POWERED

Status: Offline
Posts: 1572
Date: Jan 8, 2009

Jeezuz h christ!!!!!!!!!!!!!

__________________

FECK

I am the willing
Led by the unknowing
Doing the impossibe
For the ungrateful.



The Piss Artist Formerly Known As Mark

Status: Offline
Posts: 879
Date: Jan 9, 2009

bloody lorry drivers they stop for nothing!!!!!!!!!

__________________

Lets just have some fun



!!!!!!GOD!!!!!!

Status: Offline
Posts: 1879
Date: Jan 9, 2009

steering wheel attendants.....all fik as!!!

__________________
        


Guru

Status: Offline
Posts: 758
Date: Jan 9, 2009

I know what it is............

its one of them Air Brakes like whats fitted to Bugatti Veyrons.




__________________
Jebus, Allah, Buddah. I love you all!



Rum Boy

Status: Offline
Posts: 2049
Date: Jan 9, 2009

That bridge was probably built with that sub standard cemex concrete! biggrin
hey Mark? wink

__________________

ARSE!



Senior Member

Status: Offline
Posts: 307
Date: Jan 10, 2009

Pmsfl ! prob did the same thing that donut did with the Dumps digger and forgot to lock the hydraulics ! That did almost the same thing as its arm raised up as it was moving and hit the bridge near bucklesham

__________________

Restore,Renovate,Respect For Years To Come

Austin A40 Farina Mk2 1967
0-60  = 27.1secs
35Mpg
TAX Exempt



The Piss Artist Formerly Known As Mark

Status: Offline
Posts: 879
Date: Jan 10, 2009

chucky wrote:

That bridge was probably built with that sub standard cemex concrete! biggrin
hey Mark? wink



Yeah your probally right there .
the contractors could have been b&w and they saved some money not putting enough steel inbiggrinbiggrin



__________________

Lets just have some fun



Guru

Status: Offline
Posts: 758
Date: Jan 10, 2009

mark wrote:

 

chucky wrote:

That bridge was probably built with that sub standard cemex concrete! biggrin
hey Mark? wink



Yeah your probally right there .
the contractors could have been b&w and they saved some money not putting enough steel inbiggrinbiggrin

 




 Bloody Polish builders!!



__________________
Jebus, Allah, Buddah. I love you all!



Senior Member

Status: Offline
Posts: 361
Date: Jan 10, 2009

looks more drunk to me

__________________



Higher than Mr Bowtie

Status: Offline
Posts: 1264
Date: Jan 10, 2009

my guess is 55 mph 3 seconds to stop and distance 15ft biggrin.gif



__________________
one life   live it
Page 1 of 1  sorted by
 
Quick Reply

Please log in to post quick replies.

Tweet this page Post to Digg Post to Del.icio.us


Create your own FREE Forum
Report Abuse
Powered by ActiveBoard